The Awak Mas Gold Project Probable Reserve at 0.5 g/t Au cut‐off using a US$1250/oz gold price is 26.9 Mt at 1.32 g/t Au for 1.14M contained ounces (reported September 2018). The Ore Reserve estimate (Table 1) is based on the Mineral Resource estimate reported for the Awak Mas and Salu Bulo deposits in May 2018, and work completed in the first stage of the Definitive Feasibility Study (DFS).  

The DFS was completed in October 2018, confirming a robust, long-life, low cost gold project.

Awak Mas table.PNG